Conveyance
Canopus
A configurable conveyor family for horizontal, inclined, inter-zone and process movement.
Product logic
Built as a repeatable platform. Configured around the operation.
The final configuration depends on verified product, process, layout, controls and host-system requirements.
Configuration scope
- Belt, roller and plastic modular formats
- Powered and gravity options
- Process and machine interfaces
- Configured for load, duty and environment
Why NIDO
Horizontal, inclined, vertical and pallet-flow interfaces can be engineered as one system.
Controls and NIDO OS provide consistent diagnostics and operating visibility.
Built, integrated and supported by the same accountable team.
The right comparison is architecture against architecture: practical throughput, load envelope, destinations, footprint, deployment conditions, integration, maintainability and lifecycle cost. Final claims are validated against the actual site.
Relevant applications
Cross-docking — in-to-out
Move received goods directly toward outbound staging without storage.
Explore ↗A12Floor-to-floor / mezzanine flow
Connect operating levels without breaking the material-flow sequence.
Explore ↗A13Truck turnaround & dock labour compression
Improve unloading, loading and dock utilisation around vehicle windows.
Explore ↗A19Dealer / spares distribution routing
Route high-SKU parts to dealers, branches or dispatch lanes.
Explore ↗A20Case / unit routing
Route cases or units through distribution networks and outbound staging.
Explore ↗A22Cold-chain sortation
Route temperature-controlled loads using application-rated equipment.
Explore ↗A26Finished-goods dispatch & loading
Move plant output through staging, routing and vehicle loading.
Explore ↗Size, weight, surface, orientation and exceptions.
Rate, peaks, destinations and operating windows.
Business rule, data source and confirmation.
Sample test, concept, FAT and site readiness.
Build around the operation
Bring us the bottleneck and the operating data.
We will map the process, test product fit and define the right next step.
Start a conversation